SEDSAT-2 Systems:General Specifications, Characteristics and Interface design

From SEDSWiki

Jump to: navigation, search

Timelines:

  • 29 April: Payload Subsystem presents final concepts for payload for team to discuss.
  • 06 May: Entire SEDSAT-2 team chooses the payload.
  • 13 May: Outline of Payload Selection Study (PSS) due.
  • 20 May: First draft of PSS due.
  • 27 May: Final draft of PSS due. Payload Selection Review (PSR) begins, reviewed by advisers.
  • 03 June: Interface tables due.

Kirk's weight budget: (copied from here)

Structure 300g
Payload 200g
Attitude Control 100g
Power 250g
Communications 100g
Margin 50g (can't use this)
  • Total: 1000g

Structure Requirements

Just posted it here. Hopefully you can make it into a matrix where everyone can see. Pradeep 10:32, 13 May 2007 (MDT)Pradeep

  • Area (lxb terms) covered by the equipment
  • Volume occupied by the equipment
  • Mass of the component.
  • Heat generated or required
  • Optimum Working Temperatures of the component
Personal tools